Berkant ÜsenENGINEERING PORTFOLIO
← All selected work

SUPERVISED INTERNSHIP · 2024

Where the drawing meets the workshop.

Electrical assembly, copper busbar fitting, and practical troubleshooting at Onur Elektrik.

Context

Two supervised placements at Onur Elektrik in 2024, documented as eight weeks in total. The work involved electrical-panel components, industrial sockets, copper busbars, cable management, and network troubleshooting.

My contribution

  • Measured, cut, bent, and fitted copper busbars within modular panel constraints.
  • Assisted with component assembly and checked cable lengths and physical fit under supervision.
  • Helped trace a network fault to a defective cable, replace it, and organize the cabling.

Approach

Fit was an iterative task: check the available space, prepare the part, compare it with surrounding components, and revise bends where parts interfered. Troubleshooting also required following the physical connection, not assuming the fault from its symptoms.

  1. 01Measure
  2. 02Fit
  3. 03Check
  4. 04Revise
NEW SCHEMATIC · 2026

A bend changes the fit.

  1. 01Interference
  2. 02Revise the bend
  3. 03Check the fit

In the report, surrounding components constrained the busbar shape. Bends were revised and the part checked again against the available space. This schematic illustrates that sequence without reproducing workshop dimensions.

Learning

Assembly made dimensional constraints tangible. A component has to work with the parts around it; checking fit and keeping cables organized are part of that work.

Sources & scope

Based on my self-authored internship report. The work describes supervised participation. Portfolio illustrations are new explanatory schematics, not internship photographs.

BÜ / AFTER HOURS

Tetris

Score0Level1Lines0

Make room for one more.

← → move · ↑ rotate · ↓ soft drop · Space hard drop · P pause. Touch controls below.

Just a little break. No saved scores.